ELECTRIFY INTERIO

Terms & Conditions

These terms set out the basis on which ELECTRIFY INTERIO provides interior design, modular furniture, painting, civil and related project services.

← Back to home

01 Scope of Work

1.1. Electrify Interio shall execute the work strictly according to the approved quotation, Bill of Quantities (BOQ), drawings, specifications and agreed scope of work.

1.2. The scope includes interior design, modular kitchens, wardrobes, furniture, false ceilings, painting, civil work, electrical work, plumbing work and other services specifically mentioned in the quotation.

1.3. Any work, material, service/activity not expressly mentioned in the approved BOQ or quotation shall be treated as an additional item and charged separately.

1.4. The customer shall review and approve the scope, material specifications, finishes, quantities and commercial terms before execution.

1.5. Verbal discussions or instructions shall not override the approved scope unless confirmed in writing by both parties.

02 Quotation and BOQ

2.1. All quotations and BOQs shall be based on the information, measurements and requirements available at the time of preparation.

2.2. Quantities are subject to final site measurements and technical validation. Any variation arising from actual site conditions shall be communicated to the client.

2.3. The final payable amount shall be based on the approved scope, agreed rates and approved variations.

2.4. Any additional work or change in specifications requested by the client shall be quoted separately.

2.5. Material prices, availability and delivery schedules may change after the quotation validity period. Any resulting revision must be communicated and agreed upon before the affected work is undertaken.

03 Payment Terms

3.1. The client shall make payments according to the milestones specified in the approved quotation or work order.

3.2. The following payment schedule may be used:

MilestonePayment
Booking and project confirmation10%
Design finalization and approval40%
Completion of approximately 50% of the agreed civil/site work25%
Before final modular dispatch or at the agreed final-stage milestone25%

3.3. Payments shall be made through the bank account, UPI or other authorized payment methods communicated by Electrify Interio.

3.4. Applicable GST and other legally chargeable taxes shall be invoiced separately where required and shall be payable by the client.

3.5. Electrify Interio may pause further work, procurement, manufacturing, dispatch or installation if a payment remains overdue, subject to the contract and applicable law.

3.6. Any resulting delay in the project schedule shall be adjusted reasonably to account for the payment delay, remobilization and revised resource availability.

3.7. No material shall be dispatched from the factory until the agreed dispatch-payment conditions have been met.

04 Design and Drawing Approval — BOQ Part

4.1. Design work shall commence after receipt of the agreed initial payment and the information required from the client.

4.2. The client shall provide timely feedback and approvals for layouts, 2D drawings, 3D views, materials, colours, laminates, hardware and other selections.

4.4. Any change requested after approval may affect the cost, procurement, manufacturing and project timeline.

4.5. Revisions beyond the number of revisions included in the quotation may be charged separately, provided the applicable charges and limits are communicated and accepted in advance.

4.6. Drawings and 3D renders are intended to communicate design intent. Final execution shall follow the approved technical drawings, material specifications and site measurements.

4.7. Natural and manufactured materials may exhibit variations in colour, grain, texture, pattern and finish. Reasonable variations within the characteristics of the selected material shall not automatically be considered a defect.

05 Site Measurement and Site Conditions

5.1. The client shall provide safe and reasonable access to the project site for measurement, inspection, delivery and execution.

5.2. Final measurements shall be verified before manufacturing or installation of custom furniture and other made-to-measure items.

5.3. Electrify Interio shall not be responsible for discrepancies arising from incorrect information supplied by the client or from concealed site conditions that could not reasonably have been identified during the initial inspection.

5.4. Any concealed electrical wiring, plumbing, structural issues, seepage, dampness, uneven flooring, wall irregularities or other unforeseen conditions discovered during execution shall be reported to the client.

5.5. Rectification of pre-existing defects or unforeseen conditions shall be treated as additional work unless expressly included in the approved scope.

5.6. Structural modifications shall not be undertaken without the necessary technical assessment and approvals.

06 Material Selection and Procurement

6.1. Materials shall be procured according to the approved BOQ, quotation and specifications.

6.2. The client shall approve the relevant brands, finishes, colours, models and hardware before procurement, where approval is required.

6.3. If an approved material becomes unavailable, Electrify Interio may propose an alternative of comparable specifications and price for the client's written approval.

6.4. No material substitution affecting the agreed specifications shall be made without the client's approval, except where a change is otherwise legally or contractually permitted.

6.5. Materials supplied directly by the client shall be delivered in the required quantities and within the agreed timeline. Delays or shortages in client-supplied materials may affect the project schedule.

6.6. The client shall be responsible for additional costs arising from changes to already approved or procured materials, including applicable cancellation, return, restocking, transport or replacement charges, where actually incurred and lawfully recoverable.

6.7. Drawings and 3D renders are intended to communicate design intent. Final execution shall follow the approved technical drawings, material specifications and site measurements.

07 Modular Furniture and Customised Products

7.1. Modular furniture shall be manufactured according to approved drawings, dimensions, material specifications and hardware selections.

7.2. The client shall verify the approved layout, finishes, storage configuration and functional requirements before manufacturing begins.

7.3. Customised or made-to-order furniture may not be eligible for cancellation or return merely because the client changes their mind after manufacturing has commenced. This does not restrict statutory rights or remedies for defective, incorrect or non-conforming goods.

7.4. Any change to dimensions, layout, finish or hardware after manufacturing approval may result in additional charges and revised delivery timelines.

7.5. Installation may require minor site adjustments within reasonable technical limits. Significant changes to the approved design or manufacturing specifications shall be treated as additional work.

7.6. Natural material variations and reasonable differences between physical samples, screens and finished installations shall be assessed against the approved specifications and applicable quality standards.

7.7. Electrical appliances, accessories, hardware and third-party products shall be covered by their respective manufacturer warranties, where applicable.

08 Painting and Finishing Work

8.1. Painting work shall be carried out according to the agreed surface preparation, putty, primer, paint system, finish and number of coats specified in the quotation.

8.2. The client shall identify any known seepage, dampness, leakage, cracks or structural defects before painting begins.

8.3. Painting over unresolved seepage, dampness or underlying surface defects may affect the durability of the finish. Remedial work to address such conditions shall be separately assessed and quoted unless included in the approved scope.

8.4. Colour selection shall be confirmed before the relevant painting work starts.

8.5. Minor differences in shade or appearance may occur due to lighting, surface conditions, application methods and batch variations.

8.6. Additional coats, special finishes, texture effects, repairs or repainting resulting from a client-requested colour or finish change shall be charged separately where not included in the original scope.

09 Project Timeline and Delays

9.1. The project timeline shall be communicated in the approved quotation, work order or project schedule.

9.2. Unless expressly stated otherwise, timelines shall be calculated in working days and shall commence only after the required initial payment, final design approval, site readiness and other specified prerequisites have been completed.

9.3. The schedule may be extended for delays caused by:

  • Late payments or delayed approvals.
  • Changes in scope or specifications.
  • Site access restrictions or lack of readiness.
  • Delayed supply of materials or equipment.
  • Unforeseen site conditions.
  • Restrictions imposed by government authorities.
  • Events beyond reasonable control, including qualifying force majeure events.

9.4. Electrify Interio shall communicate material schedule changes to the client within a reasonable time after becoming aware of them.

9.5. Any compensation or delay-related liability shall be governed by the specific terms agreed in the signed quotation or work order and applicable law.

9.6. No clause in these terms shall automatically exclude liability for delays caused by Electrify Interio where such liability arises under the agreed contract or applicable law.

10 Site Access, Safety and Client Responsibilities

10.1. The client shall arrange site access during agreed working hours and ensure that the site is reasonably ready for the scheduled activities.

10.2. The client shall arrange any building-society permissions, entry passes, work permits, lift bookings or other permissions that are expressly assigned to the client in the work order.

10.3. The parties shall clarify responsibility for temporary electricity, water, storage space, debris removal, security and protection (if applicable) of existing property before work begins.

10.4. Neither party shall be responsible for loss or damage to the extent caused by the other party's negligence, breach of contract or unlawful act.

11 Quality Inspection and Handover

11.1. Upon substantial completion, Electrify Interio shall inform the client that the work is ready for inspection.

11.2. The client shall inspect the completed work within a reasonable period and provide a written list of observable defects or incomplete items.

11.3. Electrify Interio shall assess valid items falling within the agreed scope and arrange rectification within a reasonable period, subject to access, material availability and the nature of the issue.

11.4. Handover shall be recorded through a handover document or written confirmation identifying any pending items. Minor snagging items shall be documented and resolved according to an agreed schedule.

11.5. The client shall not be deemed to have waived a claim for a latent defect merely because it was not visible during the initial handover inspection.

12 Warranty and Defect Rectification

12.1. Any workmanship warranty offered by Electrify Interio shall be stated in the quotation or handover document, including its duration, scope and exclusions.

12.2. Manufacturer warranties for hardware, appliances, electrical equipment, paints and other products shall be governed by the relevant manufacturer's terms.

12.3. Unless otherwise stated in writing, warranty coverage shall not extend to damage caused by misuse, accidental impact, unauthorised alterations, improper maintenance, normal wear and tear, or external causes unrelated to defective workmanship or supplied products.

12.4. Seepage, structural movement, plumbing leakage, pest damage and other underlying building issues shall not be treated as defects in interior workmanship unless the cause is attributable to work for which Electrify Interio is responsible.

12.5. The client should report suspected defects in writing with photographs or other relevant information so that the issue can be assessed.

13 Cancellation, Suspension and Refunds

13.1. A client requesting cancellation shall notify Electrify Interio in writing.

13.2. On cancellation, the parties shall reconcile the value of completed work, design services, materials procured, customised items manufactured, services already performed and other reasonable, documented costs incurred for the project.

13.3. Any refund or amount payable on cancellation shall be determined in accordance Natural and manufactured materials may exhibit variations in colour, grain, texture, pattern and finish. Reasonable variations within the characteristics of the selected material shall not automatically be considered a defect.

13.4. Drawings and 3D renders are intended to communicate design intent. Final execution shall follow the approved technical drawings, material specifications and site measurements.

These terms should be read together with the applicable approved quotation, BOQ, drawings and work order.